The video production process: six steps, and what you approve in each.

A video project moves through six steps: brief, concept, script, storyboard, production and delivery. The film is made in the middle steps; what decides its quality is how well the first two are done, and what keeps the project on time is knowing where you approve. The table shows each step, who does it and what is signed off.

BLUVINO · DRINKS · BRAND FILM · 11 S · SAMPLE

Scripts and planning2 min readUpdated By the Video.app creative team

What are the steps of video production?

The traditional names are pre-production, production and post-production. The table splits them into the steps a client sees.

StepWhat happensWhat you approve
1 BriefYou say who the film is for, what it must do and where it will runThat we have understood the brief
2 ConceptWe propose the idea and how the film will feelThe idea and the tone
3 ScriptThe words, spoken and on screen. See the [script template](/guides/video-script-template)Every word
4 StoryboardThe shots, in order. See the [storyboard template](/guides/storyboard-template)The shots and their length
5 Production and editThe footage is created and cut, then picture and sound are finishedThe edit, before it is finished
6 DeliveryThe files in each ratio and length, with captionsThat the files match the scope

Which steps decide the quality of the film?

The first four. Production and the edit can only realise what the brief, the script and the storyboard contain, so a weak idea at step two is hard to rescue at step five. That is why approvals concentrate before production and why a short, clear brief is the most useful thing a client can write.

How should I give feedback?

Specific notes save rounds. Say what you see and when you see it, and say what the film should do instead of how to do it.

  • Refer to a time or a shot: at 0:12, the line promises more than we can offer.
  • Say why: it must work for a first-time buyer.
  • Keep one list and send it once, so changes are made together.
  • Mark what must change and what is a preference.
  • Do not add new scope in feedback: list it for the next film.

How does an AI production change the steps?

The steps stay the same; the cost of making a change differs. When footage is created rather than filmed, there is no crew and no location to rebook, so a change at the edit stage can be quick. Approvals before production still matter, because they keep the film on the idea you chose.

We keep the review points the same as in any production so that you know what you are approving.

How long does each step take?

We do not quote step durations because they depend on the length, the number of versions and how quickly each approval comes back. Deliveries are made in under 24 hours once the scope and the materials are agreed. Ask for a quote with the details of your film.

Common questions

What is pre-production?
Everything before the footage is made: the brief, the concept, the script and the storyboard.
Can I skip the storyboard?
For a very short film you can. Any film with several shots or several versions benefits from one.
How many rounds of changes are there?
The scope states them. The most useful change is made at script and storyboard, before production.

Tell us what the film has to do. We reply with the scope.

What it needs to achieve, where it will run and when you need it. We reply with the scope, schedule and quote.

Film